Container securing · lifting · moving — Southern Africa WhatsApp 076 546 2803  ·  +27 (0)11 609 7873  ·  info@twistlockafrica.co.za
Operation 07 · Fabricating · Complete front end — assembly

Complete Front End — HC (9′6″) — Assembly Kit

TLA-FAB-KIT-FEHC

Supplied by Twistlock Africa · fits HC (9′6″) containers

Ask an engineer

No prices online — quotations are prepared per application and quantity, usually within one business day; a more involved enquiry may take a little longer. Compare all 2 complete front end — assembly variants.

Everything that makes up the closed (front) end of a container, as one kit per height: front wall panels, two front corner posts, the front top header, the front bottom rail and the four front corner castings.

Specifications
MaterialCorten steel frame and panels; low-temperature steel corner castings
SupplyKit — every part in the parts list below, quoted as one line
Mass—
FitsHC (9′6″) containers
StandardISO 1496-1, ISO 1161

Mass — not listed; confirmed with the quotation.

Features
  • One quote line for a full front-end rebuild — or quote each part separately from the parts list
  • GP (8′6″) and HC (9′6″) kits
  • Every part also has its own page, SKU and drawing on request
Typical applications

Rebuilding a crushed or badly corroded front end; converting or re-skinning container ends; new-build fabrication.

Parts list — HC (9′6″) kit

Numbers match the exploded view at the top of the page.

No.PartQty per front end
1Front wall panels
HC (9′6″) TLA-FAB-PAN-FRHC20
HC (9′6″) · Long TLA-FAB-PAN-FRHC20L
Standard and/or long width, to suit the container — confirmed with the quotation
2Front corner post2 (left and right)
3Top header beam — front
Top Header Beam — Front TLA-FAB-THF-01
1
4Front bottom rail1
5Corner castings — the four front positions
Top Left (TL) TLA-FAB-CC-TL
Top Right (TR) TLA-FAB-CC-TR
Bottom Left (BL) TLA-FAB-CC-BL
Bottom Right (BR) TLA-FAB-CC-BR
1 of each

"Add every part" adds the frame parts and castings in the quantities shown. Choose the front wall panels from line 1 — the panelling is made up to suit your container and confirmed with the quotation.